JOURNAL
Look up public asset reuse.
Find articles by keyword, topic or stage of your project.
Change of Use for Former Government Buildings — Three Legal Walls and How to Break Through Them
When a former government building is put to a different use, the Building Standards Act, the Fire Service Act and the Act on Promotion of Seismic Retrofitting of Buildings each set their own conditions. This article checks them against the statutes and MLIT documents: the three conditions that trigger building confirmation, how to investigate a building without an inspection certificate, when fire protection equipment must meet the standards for the new use, and the effort duty, instruction and mandatory categories of the seismic retrofitting act. It then traces, from Shimoda City's own documents, how the city turned the former Inouzawa Junior High School into its city hall.
Institutional Framework for Welfare Facilities under Park-PFI — Organizing the Issues Around Inclusive Park Complex Models
Under Japan's Urban Park Act, installing social welfare facilities within public parks is institutionally permitted, and the Park-PFI (public solicitation-based installation and management system) framework can accommodate this under certain conditions. This article provides a neutral institutional review of a complex model combining inclusive parks and disability welfare (Type B continuous employment support), focusing on the legal basis and implementation issues. It is not an endorsement of any specific operator or model, but an organization of institutional options.
The Complete Guide to LABV (Local Asset Backed Vehicle) — Proposing Public Asset Development Without Waiting for Park-PFI Public Calls Through Municipal Land-Contribution LLCs
The Local Asset Backed Vehicle (LABV), originating in the UK, is a public-private joint scheme in which a municipality contributes land in-kind while the private sector contributes capital to form an LLC-type joint venture. Although Japanese case accumulation is still in its infancy, LABV deserves consideration as a third option alongside Park-PFI and Small Concessions — particularly when combined with the private-sector proposal system, which enables private actors to initiate proposals without waiting for public procurement. This guide carefully organizes the distinctions from SPCs, institutional positioning, applicable targets, implementation hurdles, and the potential scope of sequential development.
How Local Companies Become PFI Lead Sponsors — Lessons from Yonago Joint Government Building and Date City School Lunch Center Companion-Model Success
Traditionally, large general contractors and major consultants have filled the lead sponsor role in PFI projects. But local companies are now emerging as lead sponsors in nationally recognized exemplary cases. Using the Yonago Joint Government Building wide-area PFI and the Date City School Lunch Center as case studies, this article examines the companion model structure, five success conditions, and the role of municipalities in enabling local participation.
5 Park-PFI Success Cases — From Large Urban Parks to Cities of 23,000 Residents [2026 Edition]
For municipal officials: Structural analysis of 5 successful Park-PFI (Public Solicitation Management System) cases. From Kaiseizan Park's 500-point evaluation rubric and 3-phase sounding design to Kadaru Terrace Kindaichi (Ninohe City, population 23,000) — detailed preconditions and success factors.
The Toyoake Model — How a Population-70,000 City Masters the Priority Review Procedure (The "Private Sector Utilization Projects" Naming Strategy)
Toyoake City in Aichi Prefecture, with a population of approximately 70,000, established its Priority Review Procedure in FY2018 — a notable achievement given that the formulation rate among municipalities with populations between 50,000 and 100,000, the band Toyoake belongs to, stood at 17.3% as of the end of March 2025. This article examines the naming strategy of calling it 'Private Sector Utilization Projects' instead of 'PPP/PFI', the three-part organizational design (Private Utilization Promotion Office, Review Committee, Project Advisor), the lower-than-national project cost thresholds, the institutional incorporation of designated manager renewals, and the stepwise rollout of comprehensive facility management outsourcing.
The Complete Guide to Water PPP — The FY2027 Grant Requirement and the Level 3.5 Transition
A structured guide to Water PPP (since FY2025 the national government calls it Mizu no Kanmin Renkei, public-private partnership for water), the framework that entrusts the upkeep and renewal of water and sewerage to private operators together. From FY2027, receiving grants for sewage pipe renewal requires that adoption already be decided, and at Level 3.5 that means the tender must be open, not merely that an implementation policy has been published (MLIT Guideline ver. 3.0). Covers which renewal works are in scope, the level taxonomy and four requirements, Myoko City's case, and the three routes left when the deadline is out of reach.
Selecting PPP Methods by Fiscal Capacity Index — Optimal Solutions Across Five Tiers from 0.3 to Beyond 1.0
The Fiscal Capacity Index mirrors a municipality's financial health and is a decisive variable in PPP/PFI method selection. This article divides the index into five tiers (below 0.3 / 0.3–0.5 / 0.5–0.7 / 0.7–1.0 / above 1.0) and identifies the optimal PPP approach for each, with real-world examples from Manazuru Town and Shimoda City.
Fisheries Port Act Amendment 2024 — How the Fishery Port Facility Utilization System Is Transforming Harbors Through Kaigyo × PPP
A comprehensive analysis of the Fishery Port Facility Utilization Business system established by the 2023 amendment to the Fisheries Port and Fishing Ground Development Act (effective April 2024). Covers the transition from special-use permits to utilization plans, practical coordination with port managers, kaigyo revenue model design, and institutional connections with PPP/PFI frameworks.
7 Small Concession Case Studies — Municipal Approaches to Revitalizing Idle Public Assets [2026 Edition]
For municipal officials: Structural analysis of 7 municipalities selected under the FY2026 Small Concession Formation Promotion Project. Methods, preconditions, and the design intent behind specialist selection for revitalizing historic townhouses, former schools, and former government buildings.
What Is PRE Strategy? — How to Think About Activating Public Real Estate [2026 Edition]
PRE (Public Real Estate) Strategy is an approach to managing and activating the land and buildings held by local governments as strategic assets — going beyond routine maintenance to pursue asset value maximization, fiscal improvement, and community revitalization. This article explains the concept, its relationship to comprehensive management plans and PPP/PFI, and how to implement it in practice.
PPP/PFI Introduction — The Essential First Read for Municipal Officials [2026 Edition]
A from-scratch introduction to PPP and PFI for municipal officials: covers the difference between PPP and PFI, the PFI Act framework, the Cabinet Office Action Plan, the full landscape of seven PPP/PFI methods, a recommended evaluation sequence by municipality size and risk tolerance, and five common misconceptions.
READING GUIDE
Choose a starting point.
Follow a short route through the basics, examples and practical steps. Community groups, researchers and students are welcome.
ROUTE 01
For municipal planning
Start with the basics, then move through cases, process and dialogue design.
- What Is Public Facility Management? Challenges, Concepts, and Next Steps
- Sapporo Yurigahara Park Park-PFI LiLiLi — Sapporo's First Case, Community-Led SPV Park Operation
- The Complete Park-PFI Process — A Four-Year Roadmap from Concept to Opening [2026 Edition]
- Market Sounding for PPP: 8-Item Question Template and Step-by-Step Guide
ROUTE 02
For prospective operators
Understand the system, test viability and prepare a proposal.
- What Is a Small Concession? A Complete Guide for Local Government Officials [2026 Edition]
- Higashi Yuenchi URBAN PICNIC — Kobe Sannomiya Redevelopment and Park-PFI After 8 Years of Citizen-Led Social Experiments
- How to Build a Park-PFI Revenue Plan — With Simulation Template [2026 Edition]
- How to Write a Park-PFI Proposal — Working Backward from the Scoring Criteria [2026 Edition]
ROUTE 03
Learn from setbacks
See how projects stall and which conditions to avoid.
- Abandoned School Reuse Failures — Why Repurposed Schools Become Idle Again: Structural Causes of Withdrawal and Business Collapse
- 5 Patterns of Park-PFI Project Failure — Structural Analysis of Contract Termination, Financial Deterioration, and Resident Opposition
- The Zero-Response Sounding Problem — 5 Reasons Private Operators Don't Participate and How to Fix It