Skip to main content
Public Asset Utilization Media

Site menu

PUBLIC AS A COMMON GOOD

Public asset utilization,
starting from the thinking.

Operated by the Institute for Social Vision Design (ISVD)Sister media: KOSO 0Privacy Policy日本語で読む

JOURNAL

Look up public asset reuse.

Find articles by keyword, topic or stage of your project.

Filters and sort order

Showing 25–36 of 145

Abandoned School Reuse

7 Structural Patterns Behind Closed-School Failures An Operator Bankruptcy in Toho Village and 216 Unused Schools Flagged by the Board of Audit

Japan closed 8,850 schools between FY2004 and FY2023. Of the 7,612 whose buildings still stand, 1,951 (25.6%) remain unused. Drawing on the case of Toho Village, Fukuoka, where the operator of a school renovated with about ¥400 million in public money went bankrupt, the Board of Audit's report on 216 schools left unused for three years or more despite remaining service life, and MEXT's casebook and notices, this article sets out seven failure patterns and a pre-solicitation self-diagnostic checklist.

Small Concession

MLIT's Small Concession Guidebook Explained Three Walls, VFM Exemption, and Contract Risks [May 2026 Release]

On May 25, 2026, Japan's Ministry of Land, Infrastructure, Transport and Tourism (MLIT) and the Cabinet Office jointly published a 40-page practical guidebook titled 'Small Concession Recommendations — A Handbook for Utilizing Idle Public Facilities.' This article unpacks the three walls (image, partner, project execution), four case studies, the new VFM exemption criteria, the procedural simplification reducing operator selection from 1–2 years to 6–12 months, and the cross-ministry map of 14 support programs.

Public Facility Management

Water PPP After the Osaka Expo Two 'First-in-Japan' Cases, Wide-Area Consolidation, and the 2027 Deadline Municipalities Now Face

Around the time of the 2025 Osaka-Kansai Expo, Osaka City procured the renewal of its trunk water mains as a PFI (¥52.5 billion; the winning companies announced it as a first in Japan), Osakasayama and Kawachinagano jointly tendered a wide-area Level 3.5 sewerage contract (described by the two cities as Japan's first), and the Osaka Water Supply Authority grew to 19 municipalities. From FY2027, national support for sewage pipe renewal requires a decision to adopt Water PPP. This article sets out the roughly three years the two cities took to reach the tender, and seven decision axes.

Public Facility Management

PFI Guideline 2025 Revision Explained Three Pillars on Price Adjustment and Private-Sector Proposals

On June 4, 2025, Japan's Private Finance Initiative Promotion Council adopted partial revisions to the PFI Guidelines. This article unpacks the three pillars — price adjustment response, private-sector proposal promotion, and ensuring fair returns — and analyzes the practical implications for municipalities and private operators. A continuation of our earlier article on the 2024 PFI Act amendments.

Public Facility Management

How to Brief the Assembly Explanation Templates and Anticipated Questions for PPP/PFI Adoption

Assembly briefings are an unavoidable step when adopting PPP/PFI. This article provides templates for briefing timing, frequency, and material structure, along with frequently asked questions from assembly members and model answers — a practical guide for securing assembly approval smoothly.

Public Facility Management

Operator Bankruptcy Response in PFI and Designated Manager Projects Municipal Risk Management

When a PFI operator or designated manager goes bankrupt, the municipality must simultaneously ensure service continuity and minimize impact on residents. This article systematically covers response procedures by bankruptcy type (financial deterioration, sudden insolvency, voluntary withdrawal), direct management reversion procedures, contractual risk hedging, and monitoring structures for recurrence prevention.

Public Facility Management

Resident Lawsuits and Injunction Cases in PPP/PFI Projects Legal Risks and Prevention

A systematic analysis of cases where PPP/PFI projects became targets of resident lawsuits and injunction requests. Covers the pattern from resident audit requests to lawsuits, the requirements for granting injunctions, and risk management strategies for both municipalities and operators — providing a framework for preventive legal risk management.

Public Facility Management

Optimal PPP/PFI Method Selection by Municipality Size From Under 50,000 to Designated Cities

The optimal PPP/PFI method varies by municipality population, fiscal capacity, and organizational resources. This article presents a framework for realistic method selection across five population tiers — from municipalities under 50,000 to designated cities — analyzing success requirements and considerations for each stage.

Public Facility Management

PFI Act Amendment Trends Key Points of the 2024 Revision and Impact on Municipalities

A comprehensive analysis of recent PFI Act amendments: the 2022 amendment (effective 2023) expanding eligible facilities to include sports and assembly venues, strengthening concession-designated manager system coordination, and the 2024 Action Plan revision with updated priority areas and upward-revised project targets.

Public Facility Management

PPP/PFI FAQ for Private Sector Operators Entry, Procedures, and Risk Questions Answered

A systematic compilation of 30 practical questions for private sector operators considering entry into PPP/PFI projects. Covers sounding survey participation, proposal writing, risk allocation concepts, and local business entry barriers — with detailed answers to the 10 most critical questions.

Public Facility Management

Public Asset Management FAQ for Municipal Officials 30 Essential Questions Answered

A systematic compilation of 30 practical questions that municipal facility management and planning staff frequently face — from comprehensive management plan formulation to PPP/PFI method selection and resident consensus building — with detailed answers to the 10 most critical questions.

Abandoned School Reuse

Comparing Closed School Reuse by Use: Survey Counts, Contract Forms in the 47 Casebook Cases, and the Building Standards Act by Use

A side-by-side look at closed school uses: the counts by use in MEXT's survey (school buildings and gymnasiums, and differences from the previous survey), the contract forms (lease, transfer, conversion) by use across the 47 cases in MEXT's casebook, and which uses need change-of-use confirmation when converted from a school and which may be built in category 1 low-rise exclusive residential zones, checked against the survey, the casebook and the Building Standards Act.

READING GUIDE

Choose a starting point.

Follow a short route through the basics, examples and practical steps. Community groups, researchers and students are welcome.

Essential site functions are always enabled. You can change optional cookie preferences here at any time.

Learn more

Search articles

Type what you want to find. Separate several words with spaces.

Search article titles, summaries and full text.

Primary sourcesGlossaryFAQ